A BIG THANKS goes out to Blake from North Valley Bank for having the confidence in us to tackle a tricky sewer main problem. The Cherry Meadows project was put on hold several years ago and has since then flooded the sanitary sewer system with ground water and heavy sludge. The original test plugs were still in place causing any infiltration to flood up to 1500' of sewer main pipe. We were able to pump out @ 75% of the water, then we had to pull an 8" test plug under tremendous head pressures. Once the flood water was removed we were then able to do a complete power jetting of the pipes, then install a new mechanical plug at the manhole in the street. |