A BIG THANKS goes out to Sports Authority Field at Mile High Stadium for having the confidence in us to inspect the under field drainage system and hot water heat supply pipes. SCG is doing a complete refurbish of the playing field and needed to know exactly what is going on underground. It's been 14 years since the current system was originally installed. We were able to video tape all of the drain pipes and hot water supply pipes for their records. |